A Tampa fixer-upper carries three title risks the inspection won't catch, which are open or expired permits, code enforcement fines and unpaid contractor liens. Inside city limits, the City of Tampa's online permit portal shows every permit on the address without an account, and its lien search reports code cases and fines within 7 business days.
Open and Expired Permits
A permit that was pulled and never finaled stays open in the city's system. A roof, a water heater, a pool enclosure or a room addition with an expired permit means the work was never inspected, and the problem transfers with the house. Lenders and insurers ask about it, and the next buyer's title company will too.
The City of Tampa's permitting portal lets anyone search permits by address without an Accela account, and the results list each permit and its status. Homes in Brandon, Riverview and the rest of unincorporated Hillsborough run through the county's system. Pull the history during the inspection period, because closing a permit can mean opening a wall.
Code Enforcement Fines That Become Liens
A house that's been sitting with a tarp on the roof and a yard full of debris usually has a code case to go with it. Daily fines accrue while the violation stays open, and under section 162.09 of the Florida Statutes a recorded fine order becomes a lien on the property and on everything else the violator owns.

The City of Tampa's lien search is the way to find the case before it's recorded. The City's page states that the owner of record is responsible for resolving any active code action, and that a violation left open can result in a lien after the sale. Our post on how liens affect a Tampa closing covers paying one off at the table.
Homestead property can't be foreclosed for a code lien, but that protection belongs to the current owner living there, and it doesn't make the lien disappear when an investor buys the house.
Contractor Liens From the Seller's Work
A seller who patched the house up to list it may not have paid everyone. Florida's construction lien law gives a contractor, subcontractor or supplier 90 days from their last work to record a claim of lien, and the lien attaches to the property, not to the person who hired them. Our post on mechanic's liens for Florida buyers explains how a lien from the seller's contractor becomes the buyer's problem.
We ask the seller for a list of anyone who worked on the house in the months before closing and get lien releases or a seller's affidavit covering them. If a notice of commencement was recorded for the project, we check that it was terminated, because an open one tells a title examiner the work may still be in progress.
Financing the Repairs
The title side doesn't change with a renovation loan, but the timeline does, because the lender's contractor bids and draw schedule have to be in place before closing. The 14 Days To Close post on financing a Florida fixer-upper with an FHA 203k loan explains how those loans work. For a cash purchase, our post on cash closings in Tampa covers what we still order even with no lender in the deal.
What We Order on Every Fixer-Upper
The title search, the municipal lien search and a survey, plus the permit history from the city or county. We read the results against each other, because an open permit on a fence and a code case about the same fence are one problem, not two. Run the owner's policy premium on our Florida title insurance calculator, and send us the address the day you write the offer so the searches are back before the inspection period ends.
Frequently Asked Questions
How do I check for open permits on a Tampa house?
The City of Tampa's online permitting portal lets anyone search permits by address without an account. The results show every permit pulled on the property and its status, so an expired roof or pool permit shows up before you close. Homes in unincorporated Hillsborough County search through the county's permitting system instead.
Do code enforcement liens transfer to the buyer?
Yes, once the city records the fine order. Under section 162.09 of the Florida Statutes a recorded order is a lien on the property, and the City of Tampa's lien search page says the owner of record is responsible for resolving any active case. The lien search is how we find the ones that haven't been recorded yet.
Can a contractor the seller didn't pay put a lien on the house after I buy it?
Under chapter 713 a contractor has 90 days from the last work to record a claim of lien, so work finished shortly before closing can still produce a lien afterward. We ask for lien releases from any contractor who worked on the house in the months before the sale.
Does title insurance cover unpermitted work?
No, because an owner's policy covers defects in the title, like a forged deed or a missed lien. It doesn't cover a room addition that was built without a permit or the cost of bringing it up to code. That's an inspection and contract issue, which is why we flag the permit history early.